Customization: | Available |
---|---|
Transport: | by Land or Sea or Air |
Factory or Trader: | Factory |
Still deciding? Get samples of US$ 0.1/Set
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Single-row Tapered Roller Bearings: Most basic and widely used tapered bearing. Usually fitted as one of an opposing pair. During equipment assembly, can be set to the required clearance (end play) or preload condition to optimize performance. Double-row Bearings: Two-row tapered bearing arrangements offer increased load capacity over single types. Four-row Bearings: Combine the inherent high-load, radial/thrust capacity and direct/indirect mounting variables of tapered roller bearings into assemblies of maximum load rating in a minimal space.
Name: | Factory Bearings Supplier 69349/10 102949/10 104949/10 104948/10 Tapered/Auto/Spherical/Needle/Wheel Bearing for Car Truck Parts |
Model No. | 69349/10 102949/10 104949/10 104948/10 |
Type: | Tapered Roller Bearing/Taper Roller Bearing |
Weight: | Standard weight |
Specifications: | Standard size |
Material: | Chrome steel GCR-15 |
CAGE: | Steel Cage and Nylon Cage |
Rolling body: | Roller |
Specification | Boundary dimensions(mm) | Mass(kg) | ||
d | D | B | ||
30202 | 15 | 35 | 11.75 | 0.053 |
30203 | 17 | 40 | 13.25 | 0.079 |
30204 | 20 | 47 | 15.25 | 0.127 |
30205 | 25 | 52 | 16.25 | 0.157 |
30206 | 30 | 62 | 17.25 | 0.238 |
30207 | 35 | 72 | 18.25 | 0.340 |
30208 | 40 | 80 | 19.75 | 0.438 |
30209 | 45 | 85 | 20.75 | 0.488 |
30210 | 50 | 90 | 21.75 | 0.558 |
30211 | 55 | 100 | 22.75 | 0.736 |
30212 | 60 | 110 | 23.75 | 0.930 |
30213 | 65 | 120 | 24.75 | 1.180 |
30214 | 70 | 125 | 26.25 | 1.300 |
30215 | 75 | 130 | 27.25 | 1.430 |
30216 | 80 | 140 | 28.25 | 1.690 |
30217 | 85 | 150 | 30.5 | 2.120 |
30218 | 90 | 160 | 32.5 | 2.600 |
30219 | 95 | 170 | 34.5 | 3.130 |
30220 | 100 | 180 | 37 | 3.780 |
30221 | 105 | 190 | 39 | 4.520 |
30222 | 110 | 200 | 41 | 5.280 |
30224 | 120 | 215 | 43.5 | 6.280 |
30226 | 130 | 230 | 43.75 | 6.830 |
30302 | 15 | 42 | 14.25 | 0.098 |
30303 | 17 | 47 | 15.25 | 0.134 |
30304 | 20 | 52 | 16.25 | 0.172 |
30305 | 25 | 62 | 18.25 | 0.270 |
32207 | 35 | 72 | 24.25 | 0.456 |
32208 | 40 | 80 | 24.75 | 0.549 |
32209 | 45 | 85 | 24.75 | 0.602 |
32210 | 50 | 90 | 24.75 | 0.644 |
32211 | 55 | 100 | 26.75 | 0.860 |
32212 | 60 | 110 | 29.75 | 1.180 |
32213 | 65 | 120 | 32.75 | 1.550 |
32214 | 70 | 125 | 33.25 | 1.660 |
32215 | 75 | 130 | 33.25 | 1.720 |
32216 | 80 | 140 | 35.25 | 2.130 |
32217 | 85 | 150 | 38.5 | 2.640 |
32218 | 90 | 160 | 42.5 | 3.410 |
32219 | 95 | 170 | 45.5 | 4.220 |
32220 | 100 | 180 | 49 | 5.050 |
32221 | 105 | 190 | 53 | 6.260 |
32222 | 110 | 200 | 56 | 7.350 |
32304 | 20 | 52 | 22.25 | 0.241 |
32305 | 25 | 62 | 25.25 | 0.376 |
32306 | 30 | 72 | 28.75 | 0.570 |
32307 | 35 | 80 | 32.75 | 0.765 |
32308 | 40 | 90 | 35.25 | 1.050 |
32309 | 45 | 100 | 38.25 | 1.420 |
32310 | 50 | 110 | 42.25 | 1.880 |
32311 | 55 | 120 | 45.5 | 2.390 |
32312 | 60 | 130 | 48.5 | 2.960 |
32313 | 65 | 140 | 51 | 3.600 |
32005X | 25 | 47 | 15 | 0.116 |
Q:What's your after-sales service and warranty?
A: We promise to bear the following responsibilities when defective products were found:
1. Replacements would be sent with goods of your next order;
2. Refund for defective products if customers require.
Q:Do you accept ODM&OEM orders?
A: Yes, we provide ODM&OEM services to worldwide customers, we also customize OEM box and packing as your requirements.
Q:What's the MOQ?
A: MOQ is 10pcs for standardized products; for customized products, MOQ should be negotiated in advance. There is no MOQ for sample orders.
Q:How long is the lead time?
A: The lead time for sample orders is 3-5 days, for bulk orders is 5-15 days.
Q:Do you offer free samples?
A: Yes we offer free samples to distributors and wholesalers, however customers should bear freight. We DO NOT offer free samples to end users.
Q:How to place order?
A: 1. Email us the model, brand and quantity,shipping way of bearings and we will quote our best price for you;
2. Proforma Invoice made and sent to you as the price agreed by both parts;
3. Deposit Payment after confirming the PI and we arrange production;
4. Balance paid before shipment or after copy of Bill of Loading.